Building Facade lighting, Project

Exterior architectural facade lighting project of PM house Ajk

PM House Muzaffarabad Facade Lighting — 300m COB Strip, Wall Washers & Pine Tree Uplighting | Newon Pakistan

The Azad Jammu & Kashmir Prime Minister House in Muzaffarabad now shines with complete architectural facade lighting designed, supplied, and installed by Newon Lighting Pakistan — combining approximately 300 metres of waterproof COB LED strip in aluminium profiles, pillar wall washers, and ground-mounted pine tree uplighting, all at 3000K warm white, controlled by an automatic timer system protected by a 3-phase distribution board with 12 independent MCBs. This government facade lighting project demonstrates how layered architectural illumination — linear outlines, column wall washing, and landscape tree uplighting — can transform a state building into a dignified, welcoming symbol of governance after dark. Newon conducted the initial site survey, produced the complete lighting design from concept to budget, and delivered turnkey installation following AJK government approval. This case study covers the full technical specification, electrical protection architecture, installation methodology, and design philosophy behind one of Newon’s most significant government projects in Azad Kashmir.

Project Overview — PM House Muzaffarabad Facade Illumination

Parameter Detail
Project Exterior Architectural Facade Lighting — PM House, AJK
Client Government of Azad Jammu & Kashmir
Location Prime Minister House, Muzaffarabad, AJK, Pakistan
Scope Complete facade lighting: design, supply, installation, commissioning
Design Goal Highlight official architecture; project a welcoming, dignified symbol of state governance at night
Lighting Style Layered: linear COB outlines + pillar wall washing + tree ring uplighting
Colour Temperature 3000K warm white (all fixtures)
Contractor Newon Lighting Pakistan, Islamabad
Project Page View Full Project →

“The proposed lighting design creates a balanced, layered night view by combining linear outlines, pillar wall washing, and tree ring uplighting. Thanks to the AJK government’s approval of our model, the breathtaking result speaks for itself — the PM House now stands as a beacon of dignified governance after dark.”

— Newon Design Team, Islamabad

Design Philosophy — Layered Architectural Illumination for State Buildings

The PM House facade lighting follows a three-layer design strategy that Newon has refined across government and heritage projects throughout Pakistan. Rather than flooding the entire building with uniform light, the design selectively illuminates architectural features to create depth, hierarchy, and visual interest after dark.

Layer 1: Linear COB Strip Outlines

Approximately 300 metres of waterproof COB LED strip light traces the horizontal and vertical lines of the PM House facade. The COB (Chip-on-Board) technology produces a continuous, dot-free light line — critical for a government building where visible LED dots would undermine the dignified appearance. The strip is housed in aluminium profiles with acrylic diffuser covers, providing mechanical protection against Muzaffarabad’s monsoon rains, winter frost, and dust while producing a smooth, even glow.

The 3000K warm white colour temperature was deliberately chosen to complement the building’s concrete and stone surfaces. Per CIE S 025 recommendations for architectural lighting, warm white in the 2700K–3000K range renders natural building materials accurately while creating an inviting, non-institutional atmosphere.

Layer 2: Pillar and Column Wall Washing

Structural columns and pillars receive dedicated wall washer fixtures that graze light upward across their surfaces. This technique — documented in Newon’s guide to common lighting fixtures for architectural facade illumination — emphasises the vertical rhythm of the building’s colonnade and creates shadow play that adds three-dimensional depth to the flat facade plane.

Layer 3: Pine Tree Uplighting

Ground-mounted COB spot lights are positioned at the base of pine trees surrounding the PM House compound. These uplights illuminate trunks and lower canopies, creating a natural frame around the building and softening the transition between the illuminated facade and the dark mountain landscape beyond. This approach mirrors the tree illumination technique Newon deployed along Srinagar Highway for the OIC Conference and at the mosque tree and boundary wall project in Islamabad.

 

Fig 1: The Azad Jammu & Kashmir Prime Minister House in Muzaffarabad illuminated with 300m waterproof COB strip in aluminium profiles, pillar wall washers, and pine tree uplighting — designed, supplied, and installed by Newon Lighting Pakistan. All fixtures at 3000K warm white, controlled by automatic timer with 3-phase DB protection.

Fig 1: The Azad Jammu & Kashmir Prime Minister House in Muzaffarabad illuminated with 300m waterproof COB strip in aluminium profiles, pillar wall washers, and pine tree uplighting — designed, supplied, and installed by Newon Lighting Pakistan. All fixtures at 3000K warm white, controlled by automatic timer with 3-phase DB protection.

Electrical Architecture — 3-Phase Distribution Board and Zone Protection

A 300-metre COB strip installation on a government building demands rigorous electrical protection. Newon designed a 3-phase distribution system that ensures any single fault isolates only one zone — never the entire building.

Component Specification Function
Master Protection 30A Triple-Pole MCCB Master protection and isolation for the entire lighting system
Zone Protection 12 × 16A MCBs (4 per phase) Each MCB protects one lighting zone independently; single fault trips only that zone
Neutral & Earth Dedicated neutral and earth blocks Common, code-compliant connection points for every circuit
Phase Wiring Red / Yellow / Blue (phases), Black (neutral), Green/Yellow (earth) Colour-coded 3-phase supply for instant identification by any electrician
Timer Control Automatic voltage-control timer ON at 7:00 PM, OFF at 1:00 AM, 7 days/week; reprogrammable on site for seasonal changes

This protection architecture complies with the Pakistan Energy Conservation Building Code (ECBC) 2023 requirements for automatic lighting control in government buildings. The timer eliminates manual operation entirely — lights switch on at 7:00 PM and off at 1:00 AM, seven days a week, with no human intervention required. As seasonal sunset times shift across Muzaffarabad’s mountainous terrain, facility staff can reprogram the schedule on site without calling an electrician.

The zone division strategy — 12 zones across 3 phases — ensures load balancing. Each phase carries approximately 100 metres of COB strip plus its share of wall washers and tree lights. If a single zone develops a fault, only that zone’s 16A MCB trips. The remaining 11 zones continue operating, and the 30A MCCB remains closed. This is critical for a government building where complete darkness due to a single cable fault would be unacceptable.

COB Strip Installation — 300 Metres in Aluminium Profiles

The facade’s primary lighting element is approximately 300 metres of AC220V waterproof COB LED strip, installed in surface-mounted aluminium profiles with acrylic diffuser covers. COB technology was specified over conventional SMD strip for three reasons:

  • Zero visible dots: COB (Chip-on-Board) packages multiple LED dies under a single phosphor layer, producing a continuous light line with no individual LED points visible — essential for a government building facade viewed at close range by visitors and dignitaries.
  • Uniform output: The continuous phosphor layer eliminates the bright/dim alternation visible in SMD strip at oblique viewing angles, ensuring consistent illumination along the full 300-metre run.
  • Thermal management: The aluminium profile acts as a heatsink, conducting heat away from the COB junction. This is critical in Muzaffarabad where summer ambient temperatures reach 35°C+ and enclosed profile temperatures can exceed 55°C.

The strip is divided into 12 parts to manage electrical load across the 3-phase system. Each part connects to its own MCB-protected circuit, ensuring balanced loading and independent fault isolation. The aluminium profiles are cut to measured lengths on site using a fine-tooth hacksaw, with cut ends sealed to prevent moisture ingress — a detail that matters in AJK’s monsoon climate where annual rainfall exceeds 1,500mm.

For projects requiring flexible installation around curved surfaces, Newon also offers flexible outdoor wall washer strips and linear outdoor facade lights that complement the COB strip system. The advantages of flexible LED wall washer lights are documented in Newon’s technical blog.

Wall Washers and Tree Lights — Completing the Layered Composition

Column Wall Washers

The PM House’s structural columns receive dedicated wall washer fixtures that graze light upward across their surfaces. This technique emphasises the vertical rhythm of the colonnade and creates shadow gradients that add depth to the facade. The wall washers operate at the same 3000K warm white as the COB strip, maintaining colour consistency across all three lighting layers.

Newon’s range includes DMX512 controlled RGBW wall washers for projects requiring programmable colour effects, and remote control RGB wall washers for simpler colour-changing applications. For the PM House, static warm white was specified to maintain the dignified, consistent appearance appropriate for a seat of government.

Pine Tree Uplighting

Ground-mounted COB spot lights at the base of pine trees illuminate trunks and lower canopies, creating a natural frame around the building. The LED outdoor garden COB spot lights used in this project deliver focused 3000K warm white output with narrow beam angles ideal for trunk uplighting. The fixtures are rated for permanent outdoor installation in soil, surviving Muzaffarabad’s monsoon saturation and winter frost cycles.

This tree lighting approach is consistent with Newon’s methodology documented in the types of outdoor landscape lighting guide and the uplighting techniques reference. Similar tree illumination was deployed at the Peshawar Museum under the KP KITE Project and the Sethi House heritage illumination.

Automatic Timer Control — Zero Manual Operation

The entire PM House facade lighting system runs on an automatic voltage-control timer. The schedule is straightforward:

  • ON: 7:00 PM — seven days a week
  • OFF: 1:00 AM — seven days a week
  • Manual operation: Installed 
  • Seasonal adjustment: Reprogrammable on site as sunset times change

This automation satisfies NEECA requirements for automatic lighting control in government buildings under the ECBC 2023 framework. The timer also protects the system from voltage fluctuations common in AJK’s grid infrastructure — the voltage-control function prevents damage to LED drivers during surges and brownouts that are frequent in Muzaffarabad’s mountainous terrain.

For projects requiring more sophisticated control, Newon offers DMX512 main controllers and DMX sub-controllers that enable programmable scenes, colour changes, and dynamic effects. The PM House uses a simpler timer-based system appropriate for a government building that requires consistent, dignified illumination rather than dynamic colour displays.

Who This Project Matters To

For Architects and Lighting Designers

The PM House facade demonstrates a three-layer illumination strategy — linear outlines, pillar wall washing, and tree uplighting — that can be adapted for any government, heritage, or institutional building in Pakistan. The 3000K warm white specification aligns with CIE S 025 recommendations for architectural lighting of natural stone and concrete surfaces. The COB strip’s dot-free output is essential for facades viewed at close range, where individual LED points would undermine the design intent. Architects specifying facade lighting for Pakistani government buildings should reference the IES standards for exterior illumination levels and the ECBC 2023 lighting power density limits of 0.70–1.00 W/ft².

For Contractors and Electrical Installers

The 3-phase DB architecture — 30A MCCB master protection, 12 × 16A MCBs (four per phase), dedicated neutral and earth blocks, colour-coded wiring — provides a replicable template for any large-scale facade lighting installation in Pakistan. The zone division strategy (12 zones across 3 phases) ensures that a single cable fault isolates only one zone, never the entire building. All electrical connections must comply with the Pakistan Electrical Safety Code and be performed by qualified electricians. The IP67 waterproof power supplies and high-efficiency smart LED power supplies in Newon’s range are designed for Pakistan’s grid conditions, with wide input voltage tolerance (100–250V AC) for areas with frequent fluctuations.

For Homeowners and Residential Clients

The same layered lighting principles used on the PM House can be scaled for residential facades in DHA Islamabad, Bahria Town Lahore, or any Pakistani housing society. A homeowner can achieve a similar effect with waterproof COB strip along rooflines, garden spot lights for tree uplighting, and up-and-down wall lights for pillar accents. Newon’s DHA Islamabad garden lighting project and F-7 Islamabad outdoor lighting demonstrate residential applications of these techniques. The City Housing Sialkot facade project shows how silicone profile LEDs can create clean architectural lines on residential buildings.

For Commercial and Industrial Facility Managers

The PM House’s automatic timer system — ON at 7:00 PM, OFF at 1:00 AM, reprogrammable for seasonal changes — eliminates manual switching and reduces energy waste. At NEPRA’s 2026 commercial tariff of PKR 35–46/kWh, every hour of unnecessary illumination costs money. The 3-phase zone protection ensures that a single fault never darkens the entire building — critical for commercial properties where facade lighting is part of brand identity. Newon’s Union Square D-12 facade project and HIT Officers Mess Taxila installation demonstrate similar commercial and institutional applications. The PSO VIBE nationwide rollout shows how Newon delivers consistent, specification-grade lighting across multiple commercial sites.

Related Newon Government and Heritage Facade Projects

The PM House Muzaffarabad project is part of Newon’s growing portfolio of government and heritage facade lighting installations across Pakistan and AJK. Each project applies the same layered design philosophy — linear outlines, structural accent, and landscape integration — adapted to the specific architectural character and client requirements.

Project Location Scope
Usmania Mosque Illumination Muzaffarabad, AJK Heritage mosque facade and landscape lighting
Peshawar Museum Peshawar, KPK KP KITE Project — facade, wall washers, landscape
Sethi House Peshawar, KPK KP KITE Project — heritage facade and courtyard
DHA Phase 2 Mosque Facades Islamabad Mosque facade floodlights, dome and minaret accents
Union Square D-12 Islamabad Commercial building facade illumination
HIT Officers Mess Taxila Institutional facade and landscape lighting
Shifa International Hospital Faisalabad Healthcare campus outdoor lighting with daylight sensor automation

How to Design and Install Architectural Facade Lighting — 5-Step Professional Guide

Step 1: Site Survey and Lighting Design

Conduct a full site survey of the building facade. Measure linear metres for COB strip runs, count columns for wall washers, and map tree positions for uplighting. Produce a lighting layout drawing showing fixture positions, cable routes, and DB location. Calculate total wattage and divide into zones across three phases. Submit the design and budget proposal to the client for approval — as Newon did for the AJK government on the PM House project.

Step 2: Surface Preparation and Profile Mounting

Clean and prepare facade surfaces for aluminium profile mounting. Cut aluminium profiles to measured lengths using a fine-tooth hacksaw. Mount profiles along facade outlines, pillar edges, and architectural lines. Ensure profiles are level and continuous for seamless light lines. Seal all cut ends to prevent moisture ingress.

Step 3: COB Strip Installation and Zone Division

Install waterproof COB LED strip inside aluminium profiles, dividing the total run into independent zones (four per phase for a 3-phase system). Cut strip only at marked cut points. Connect each zone to its dedicated circuit cable. Fit acrylic diffuser covers. Mount wall washers on columns and tree uplights at tree bases. Follow Newon’s LED strip installation guide for Pakistan for detailed wiring instructions.

Step 4: Distribution Board Wiring and Protection

Install the 3-phase distribution board with a 30A Triple-Pole MCCB as master protection. Wire individual 16A MCBs (four per phase: Red, Yellow, Blue). Connect dedicated neutral and earth blocks. Use colour-coded cable throughout: Red/Yellow/Blue for phases, black for neutral, green/yellow for earth. Connect the automatic voltage-control timer to the MCCB output. All work must comply with the Pakistan Electrical Safety Code.

Step 5: Testing, Commissioning, and Timer Programming

Test each zone independently for correct operation, polarity, and insulation resistance. Verify all MCBs trip correctly under simulated fault conditions. Program the automatic timer for the required ON/OFF schedule. Conduct a full nighttime illumination test to verify uniform light output across all facade elements. Document the system and hand over to the client with warranty and maintenance schedule.

Technical Specifications — PM House Facade Lighting System

Table 1: Lighting Fixtures

Fixture Specification Application
Waterproof COB LED Strip ~300m total, 3000K warm white, in aluminium profile with acrylic diffuser Facade linear outlines
Wall Washers 3000K warm white, IP65 Column and pillar illumination
Tree Uplights COB spot, 3000K warm white, ground-mounted Pine tree trunk and canopy lighting

Table 2: Electrical Protection Architecture

Component Rating Quantity
Triple-Pole MCCB 30A 1 (master)
MCBs 16A 12 (4 per phase)
Neutral Block Dedicated 1
Earth Block Dedicated 1
Automatic Timer Voltage-control, reprogrammable 1

Table 3: Wiring Colour Code

Conductor Colour
Phase 1 (L1) Red
Phase 2 (L2) Yellow
Phase 3 (L3) Blue
Neutral Black
Earth Green/Yellow

Table 4: Timer Schedule

Parameter Setting
Switch ON 7:00 PM
Switch OFF 1:00 AM
Days 7 days / week
Manual Operation Installed for manual operation
Seasonal Adjustment Reprogrammable on site

Frequently Asked Questions — PM House Muzaffarabad Facade Lighting Pakistan

What lighting fixtures were used on the PM House Muzaffarabad facade?

The PM House facade lighting uses approximately 300 metres of waterproof COB LED strip light housed in aluminium profiles with acrylic diffusers, wall washers on structural columns and pillars, and ground-mounted tree uplights at the base of pine trees. All fixtures operate at 3000K warm white for a dignified, welcoming appearance. The COB strip is divided into multiple zones to manage electrical load across a 3-phase distribution board.

How is the PM House facade lighting controlled and protected electrically?

The system is protected by a 30A Triple-Pole MCCB for master isolation, with 12 individual 16A MCBs (four per phase) protecting each lighting zone independently. A dedicated neutral and earth block provides code-compliant connection points. The entire system runs on an automatic voltage-control timer that switches lights on at 7:00 PM and off at 1:00 AM, seven days a week, with no manual operation required. The schedule is reprogrammable on site as seasonal sunset times change.

Why was 3000K warm white chosen for a government building facade?

3000K warm white was selected to project a welcoming, dignified symbol of state governance at night. Warm white complements the natural stone and concrete tones of the PM House structure, reduces light pollution compared to cooler colour temperatures, and creates a balanced, layered night view that highlights architectural pillars and outlines without harsh glare. This aligns with CIE S 025 recommendations for heritage and government building illumination.

How does Newon divide a 300m COB strip across a 3-phase electrical system?

The 300-metre COB strip is divided into 12 independent zones, with four zones assigned to each of the three phases (Red, Yellow, Blue). Each zone is protected by its own 16A MCB, so a single fault trips only that zone and never the entire building. The 30A Triple-Pole MCCB provides master protection and isolation for the complete system. Dedicated neutral and earth blocks ensure code-compliant connections, and colour-coded wiring allows any electrician to identify and service the system instantly.

What is the role of tree uplighting in the PM House facade design?

Ground-mounted tree uplights are positioned at the base of pine trees surrounding the PM House to illuminate trunks and lower canopies. This creates a layered landscape effect that frames the building, adds depth to the night view, and softens the transition between the illuminated facade and the natural environment. The warm 3000K uplighting complements the facade COB strip and pillar wall washers, producing a cohesive architectural lighting composition.

Can Newon design facade lighting for other government and heritage buildings in Pakistan?

Yes. Newon Lighting Pakistan designs, supplies, and installs complete architectural facade lighting systems with automated timer control for mosques, government buildings, heritage structures, and commercial properties across Pakistan. Previous government and heritage projects include the Peshawar Museum and Sethi House under the KP KITE Project, the Usmania Mosque in Muzaffarabad, and mosque facades in DHA Phase 2 Islamabad. Contact Newon via WhatsApp +92 343 9227883 for a site survey and lighting design proposal.

What maintenance does the PM House facade lighting system require?

The COB LED strip and wall washers are rated for 50,000+ hours of operation, equating to over 11 years at 6 hours per night. The aluminium profiles protect the strip from dust, moisture, and physical damage. The automatic timer eliminates manual switching, reducing wear on contactors. Annual inspection of MCB connections, timer calibration for seasonal sunset changes, and visual checks of acrylic diffusers for dust accumulation are recommended.

How does the automatic timer system handle seasonal sunset changes in Muzaffarabad?

The automatic voltage-control timer is programmed on site to switch lights on at 7:00 PM and off at 1:00 AM. As seasonal sunset times shift across the year in Muzaffarabad (AJK), the schedule can be reprogrammed by facility staff without calling an electrician. This ensures the facade is illuminated during actual darkness hours while avoiding unnecessary energy consumption during longer summer evenings.

About Newon Lighting Pakistan

Newon Lighting Pakistan is an Islamabad-based architectural lighting company with 8+ years of experience and 70+ completed projects across Pakistan, AJK, and the UAE. Newon designs, supplies, and installs complete facade lighting systems for government buildings, mosques, heritage structures, commercial properties, and residential developments. Every project begins with a site survey and lighting design proposal, followed by turnkey installation and commissioning.

Newon’s product range includes LED pole lights, wall washers, silicone profile lights, aluminium LED profiles, fibre optic lighting, solar lights, and stretch fabric ceiling lighting. For UAE and GCC projects, visit newon.ae — including palm tree lights, swimming pool lights, and fountain lights.

💬 Start Your Facade Lighting Project

Newon provides free site surveys, lighting design proposals, and turnkey installation for government buildings, mosques, heritage structures, and commercial properties across Pakistan.

📧 Email: info@newon.pk
📞 Phone: +92 343 9227883
💬 WhatsApp: +92 343 9227883
📍 Address: Office No. 1, Plot #235, Street 6, Near Total Pump, I-9/2, Islamabad, 44000, Pakistan
🗺️ Google Maps: View Location

Project Gallery  |  Design Insights Blog  |  Shop All Products  |  UAE Operations (newon.ae)

Leave a Reply

Your email address will not be published. Required fields are marked *